{"version":"1.0","provider_name":"Dabanga Radio TV Online","provider_url":"https:\/\/www.dabangasudan.org\/en","title":"DRA begins reconstruction programme - Dabanga Radio TV Online","type":"rich","width":600,"height":338,"html":"<blockquote class=\"wp-embedded-content\" data-secret=\"USQDNnJD2D\"><a href=\"https:\/\/www.dabangasudan.org\/en\/all-news\/article\/dra-begins-reconstruction-programme\">DRA begins reconstruction programme<\/a><\/blockquote><iframe sandbox=\"allow-scripts\" security=\"restricted\" src=\"https:\/\/www.dabangasudan.org\/en\/all-news\/article\/dra-begins-reconstruction-programme\/embed#?secret=USQDNnJD2D\" width=\"600\" height=\"338\" title=\"&#8220;DRA begins reconstruction programme&#8221; &#8212; Dabanga Radio TV Online\" data-secret=\"USQDNnJD2D\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" class=\"wp-embedded-content\"><\/iframe><script>\n\/*! This file is auto-generated *\/\n!function(d,l){\"use strict\";l.querySelector&&d.addEventListener&&\"undefined\"!=typeof URL&&(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&&!\/[^a-zA-Z0-9]\/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret=\"'+t.secret+'\"]'),o=l.querySelectorAll('blockquote[data-secret=\"'+t.secret+'\"]'),c=new RegExp(\"^https?:$\",\"i\"),i=0;i<o.length;i++)o[i].style.display=\"none\";for(i=0;i<a.length;i++)s=a[i],e.source===s.contentWindow&&(s.removeAttribute(\"style\"),\"height\"===t.message?(1e3<(r=parseInt(t.value,10))?r=1e3:~~r<200&&(r=200),s.height=r):\"link\"===t.message&&(r=new URL(s.getAttribute(\"src\")),n=new URL(t.value),c.test(n.protocol))&&n.host===r.host&&l.activeElement===s&&(d.top.location.href=t.value))}},d.addEventListener(\"message\",d.wp.receiveEmbedMessage,!1),l.addEventListener(\"DOMContentLoaded\",function(){for(var e,t,s=l.querySelectorAll(\"iframe.wp-embedded-content\"),r=0;r<s.length;r++)(t=(e=s[r]).getAttribute(\"data-secret\"))||(t=Math.random().toString(36).substring(2,12),e.src+=\"#?secret=\"+t,e.setAttribute(\"data-secret\",t)),e.contentWindow.postMessage({message:\"ready\",secret:t},\"*\")},!1)))}(window,document);\n\/\/# sourceURL=https:\/\/www.dabangasudan.org\/wp-includes\/js\/wp-embed.min.js\n<\/script>\n","description":"The Darfur Regional Authority (DRA) inaugurated a reconstruction programme, which it considers as \u2018a first step on the recovery road\u2019 of Darfur, on Sunday, 2 December, Radio Dabanga was informed. The first step of the program included laying foundation stones in the villages of Arara, West Darfur and Roguetas, Central Darfur, the DRA claimed, adding the venture will cost 10 million Sudanese pounds. \u00a0 Dr Tijani Sese, DRA president, stated that the voluntary return of displaced and refugees to their homes villages and the reconstruction of Darfur are the \u2018overriding goals of the reconstruction programme\u2019. He noted that the DRA is adopting the reconstruction project \u2018as stated in the convention of the Doha Document\u2019. While addressing the population of these villages, Sese asserted that security and basic services in Darfur will only be achieved once voluntary return takes place. On his turn, the Qatari ambassador to Sudan, Rashid bin Al Nuaimi, said that this is an important phase for the reconstruction of Darfur, reaffirming his support for the programme. \u00a0 African Development Bank At the same time, the African Development Bank recently inaugurated a \u2018Darfur peacebuilding and conflict resolution project\u2019 in El Fasher, North Darfur, which will reportedly cost 4.5 million dollars. The bank\u2019s representative in Sudan, Abdou Kamara, explained that the project will include the construction of water sources and the rehabilitation of existing ones. He added the project aims at building and managing water use, and increasing the quantities of water produced. Besides, the project will build human and institutional capacities to reach the Millennium Development Goals. Kamara said that 20 cities in the five states of Darfur will be incorporated in the upcoming phase of this project.Radio Dabanga file photoSee also: DRA: 8 billion dollars to reconstruct Darfur (2 November 2012)","thumbnail_url":"https:\/\/www.dabangasudan.org\/wp-content\/uploads\/2022\/11\/cropped-dabanga-logo-zondernaam-512x512-1.png","thumbnail_width":512,"thumbnail_height":512}